Preliminary Build-to-Suit Questionnaire




1.      General Information



2.      Lease or Own



  • Lease
  • Own
  • Yes
  •     
  • No
  • Yes
  •     
  • No
  • North
  • Northeast
  • East
  • Southeast
  • Other
  • South
  • Southwest
  • West
  • Northwest


3.      Construction Type
  • Metal
  • Tilt Wall
  • Yes
  •    
  • No


4.      Type of Business
  • Manufacturing
  • Warehouse
  • Service
  • Distribution
  • Mixed
  • Dock High
  • Semi-Dock High *
  • Grade Level *
  • * Note: Dock high doors can be provided with a single or multiple truck wells.
  • Yes
  • No


5.      Personnel
  • Please attach:    (Allowed file types: gif | jpg | png | zip | jpeg | pdf)
              
  • Single Story
  • Two Story
  • Yes
  •           
  • No


6.      Parking
  • Yes
  • No


7.      Exterior Hard Surface Areas
  • Exclusive of parking & driveway requirements, we will need:
square feet of concrete paving
square feet of non-paved exterior hard surface area


8.      Crane Requirements


9.      Electric
  • 240 Volts
  •      
  • 480 Volts
  • Single Phase
  • 3 Phase
  • Yes
  • No
  • * Note: Do not include building heating requirement, if any, in this paragraph.
If electric requirements are unknown, we will perform a load analysis on your equipment to assist in that determination. Please click here.


10.    Gas
  • (a)
  • Heating only
  • Industrial use
  • Both
  • None needed


11.    Water
  • * Note: This number is usually indicated on City water/sewage bills.


12.    Environmental
  • No
  • Yes
  • No
  • Yes
  • No
  • Yes
  • Yes
  • No


13.    Overhead Doors
  • Yes
  • No
  • Yes
  • No


14.    Security Fencing
  • Yes
  • No